Projects Executed

Windfarm NORDSEE OST

Client: REpower AG / Senvion GmbH, Hamburg, Germany
Location: North Sea
Value: ca. € 475,0 mln
Period of time: 01.07.2011 – 31.03.2016
Service: Project management (Project Director) for the overall project including project control, cost and risk management, contract and claim management, conduct of negotiations with the client, etc.
Project data: Construction of an offshore wind park with 48 wind turbines at 6,15 MW (nominal 295 MW) turnkey from the top edge of the foundation

Windfarm WESTEREEMS

Client: REpower AG / Senvion GmbH, Hamburg, Germany
Location: Eemshaven (NL)
Value: ca. € 20,5 mln
Period of time: 01.11.2011 – 16.11.2012
Service: Project management (Project Director) for the overall project including project control, cost and risk management, contract and claim management, conduct of negotiations with the client, etc.
Project data: Extension of an offshore wind park with 2 wind turbines at 6,15 MW (nominal 12,3 MW) turnkey from inluding foundation

NADEX

Client: STRABAG AG, Vienna, Austria
Location: St. Petersburg, Russia
Value: ca. € 900 M
Period of time: August 2008 – December 2008
Service: Coordination of the tender & documentation of the civil part
Project data: Construction of a high-speed passenger traffic line, length ca. 30 km, 16 stations

Combined gas & steam turbine power station Knapsack

Client: Knapsack Power GmbH & Co. KG
Location: Hürth-Knapsack, Germany
Value: ca. € 400 M
Period of time: March 2005 – October 2008
Service: Entire project control, management and monitoring of planning, acquisition, manufacturing, construction & assembling, commissioning and performance tests
Project data: 2 gas turbines at 270 MW

2 heat recovery boiler, three stages
1 steam turbine 260 MW
balance of plant, auxillary equipment & external facilities

Flue gas desulfurization Ferrybridge

Client: Lentjes AG, Ratingen, Germany
Location: Manchester, UK
Value: n.s.
Period of time: November 2006 – September 2008
Service: Project coordination of civil part
Project data: Flue gas desulfurization and denitrification plant for a coal-fired power station including limestone preparation and disposal of plaster

Flue gas desulfurization Fiddler’s Ferry

Client: Lentjes AG, Ratingen, Germany
Location: Manchester, UK
Value: n.s.
Period of time: November 2006 – September 2008
Service: Project coordination of civil part
Project data: Flue gas desulfurization and denitrification plant for a coal-fired power station including limestone preparation and disposal of plaster

Task force special projects

Client: ThyssenKrupp Facilities Services / HiServ Gebäudedienstleistungen GmbH
Location: Frankfurt / Main, Germany
Value: ca. € 12 M
Period of time: October 2003 – September 2008
Service: Final negotiation and agreement on open claims at the end of the warranty
Project data: Main Tower – 38-floor office building for HELABA
Final negotiation and agreement on open claims by the end of the warranty
Frankfurter Welle – Completion of building automation
Negotiation and agreement on open claims
Shopping Center Nürnberg – Negotiation and agreement on open claims

Flue gas desulfurization Fiddler’s Ferry

Client: Lentjes AG, Ratingen, Germany
Location: Manchester, UK
Value: n.s.
Period of time: April 2007 – July 2007
Service: Scheduling
Project data: Flue gas desulfurization and denitrification plant for a coal-fired power station including limestone preparation and disposal of plaster

Extension of Wuppertal suspension railway

Client: ThyssenKrupp Anlagenservice GmbH
Location: Wuppertal, Germany
Value: ca. € 15 M
Period of time: January 2006 – May 2008
Service: Special representative for managing 12 legally pending disputes – amount in dispute: ca. € 14,7 M, coming from additional claims for services and compensation
Project data: Renewal and extension of the uppertal suspension railway
6 stations in steel / glass construction
13 section lots

Asbestos abatement Elbe tunnel, tube 1

Client: ARGE TEREG Gebäudedienste GmbH / TVF ALTWERT Flächenrecycling GmbH
Location: Hamburg, Germany
Value: ca. € 5 M
Period of time: April 2006 – December 2006
Service: Contractual and operational consulting regarding a compensation claim due to an unjustified extraordinary termination
Project data: Asbestos abatement
Corrosion prevention of steel tunnel lining segments

Flue gas desulfurization PEGO

Client: STEAG encotec, Essen, Germany
Location: Pego, Portugal
Value: n.s.
Period of time: March 2006 – August 2006
Service: Project management for the civil part
Project data: Flue gas desulfurization and denitrification plant for a coal power station with 2 blocks at 250 MW including associated auxilliary plants (limestone preparation and disposal of plaster)

Meghnaghat CCGT-Power Plant Phase II

Client: STEAG encotec, Essen, Germany
Location: Meghnaghat / Bangladesh
Value: ca. € 215 M
Period of time: November 2005 – December 2005
Service: Basic research for tender phase
Project data: Total power 400 MW
1 gas turbine 260 MW – 1 steam turbine 140 MW
1 heat recovery boiler, three stages
balance of plant, auxillary equipment & external facilities

Vukovar Port Development

Client: Port Authority of Vukovar
Location: Vukovar, Croatia
Value: € 802.000
Period of time: September 2003 – September 2004
Service: Complete port development study
Project data: 3-modal Container Terminal / Pick-a-Back Terminal
Bulk terminals for coal, raw materials and crop
Logistics centres / weather-independent handling terminal
Petrochemical terminal
different industrial terminals

Extension of Wuppertal suspension railway

Client: Thyssen Klönne GmbH / ThyssenKrupp Anlagenservice GmbH
Location: Wuppertal, Germany
Value: ca. € 80 M
Period of time: July 2002 – December 2005
Service: Complete project management including executive management, warranty management, claim management / legal action and reorganisation of project management
Project data: Renewal of sections and stations of the Wuppertal suspension railway
Demolition and reconstruction of 6 stations by using a steel-glass-construction
13 section lots
Demolition of the existing suspension railway bridge as well as supply and reconstruction with modified routing and track layout

Thyssen Altwert Umweltservice GmbH

Client: Thyssen Altwert Umweltservice GmbH
Location: Bottrop / Düsseldorf, Germany
Value: ca. € 50 M
Period of time: May 2003 – December 2005
Service: Management (CEO)
Project data: Claim management & claim defense
Demolition work: Tengelmann warehouse in Heilbronn, 200 MW steam power station, BASF-Ludwigshafen, etc.
Environmental protection efforts:
Asbestos abatement – Landeskrankenhaus Essen
Foundation ground rehabilitation, Berlin

Pulp mill Stendal

Client: RWE Industrie-Lösungen GmbH
Location: Arneburg (Stendal), Germany
Value: ca. € 800 M, EPC
Period of time: February 2003 – August 2005
Service: Claim defense & management for M&E-assembly & commissioning and building & infrastructure works
Project data: Pulp mill, turnkey, with own power generator, water and waste water treatment

Slavonski Brod Port Development

Client: Port Authority of Slavonski Brod
Location: Slavonski Brod, Croatia
Value: € 556.700
Period of time: October 2001 – September 2002
Service: Complete port development study
Project data: 3-modal Container Terminal / Pick-a-Back Terminal
Bulk terminals for coal, raw materials and crop
Logistics centres / weather-independent handling terminal
Petrochemical terminal
different industrial terminals

Extension of the Wuppertal suspension railway

Client: Thyssen Klönne GmbH
Location: Wuppertal, Germany
Value: ca. € 80 M
Period of time: January 2001 – June 2002
Service: Complete project management, management and monitoring of planning, acquisition, manufacturing, construction & assembling
Project data: Renewal of sections and stations of the Wuppertal suspension railway
Demolition and reconstruction of 6 stations in steel-glass construction
13 section lots
Demolition of the existing suspension railway bridge as well as supply and reconstruction with modified routing and track layout

New factory building Köppern

Client: Machine factory Köppern GmbH & Co KG
Location: Hattingen, Germany
Value: ca. DM 35 M
Period of time: September 1999 – January 2001
Service: Project planning and tender of the complete reconstruction
Project data: Turnkey construction of a new factory site for heavy machinery

Elenac polypropylen plant

Client: SAB Salzgitter Anlagenbau GmbH, Germany
Location: Berre l’Etang, France
Value: ca. DM 150 M
Period of time: July 2000 – October 2000
Service: Claim processing & management
Project data: Turnkey construction of a new polypropylene plant

Cooking oil plant IPK OSIJEK 2000

Client: CHEMA Anlagenbau GmbH, Rudisleben, Germany
Location: Cepin, Croatia
Value: ca. DM 45 M
Period of time: August 1999 – August 2000
Service: Coordination, tender and assistance with awarding of the turnkey civil part
Project data: Cooking oil plant for sunflower oil – turnkey, i.e.
seed delivery, husking and pressing unit
Refining
Bottle production & bottling plant
Margarine & mayonnaise production
Warehouse and auxiliary plants

Maritsa East III power plant

Client: DSD Dillinger Stahlbau GmbH, Düsseldorf, Germany
Location: Maritsa, Bulgaria
Value: ca. US$ 680 M
Period of time: May 1999 – August 1999
Service: Complete tender coordination
Project data: General overhaul of a 4 x 210 MW lignite power plant including extension with corresponding flue gas desulfurization plants

HATTA OILFIELD refurbishment

Client: Klöckner Industrie-Anlagen GmbH, Duisburg, Germany
Location: Hatta / Lubaish, Iraq
Value: ca. DM 200 M
Period of time: October 1999 – April 2000
Service: tender management
Project data: Oilfield rehabilitation
completely turnkey

Musi pulp mill project

Client: Klöckner Industrie-Anlagen GmbH, Duisburg, Germany
Location: Prabumulih, Sumatra, Indonesia
Value: ca. US$ 1.2 M
Period of time: 20 May 1997 – 31 December 1999
Service: Analysis of the current project status and organisational consulting
Project data: Pulp mill turnkey including infrastructure facilities, i.e.
River water extraction, treatment and distribution
Waste water treatment and disposal
Power generation and distribution
Road and rail connection
Complementing works of factory infrastructure

Seabank power plant

Client: mce Anlagen- und Rohrleitungsbau GmbH, Ratingen, Germany
Location: Seabank, Wales, UK
Value: ca. DM 24 M
Period of time: October 1999 – April 2000
Service: Claim processing & management
Project data: Combined cycle power plant
Complete pipeline construction BoP

Kerren – QM systems

Client: Johann Rösnick GmbH, Viersen, Germany
Location: Viersen, Germany
Value: n.s.
Period of time: 11 March 1996 – 31 December 1999
Service: Consulting and assistance to the development and compilation of system documentation including the optimisation of the company and the production processes
Project data: Qaulity management systems according to DIN ISO 9001 for the companies of the Kerren-group, i.e.
Johann Rösnick GmbH
KERREN Kunststofftechnik GmbH
KERREN Umwelttechnik GmbH

Cottam Development Centre

Client: mce Anlagen- und Rohrleitungsbau GmbH, Ratingen, Germany
Location: Cottam, Nottinghamshire, UK
Value: ca. DM 14 M
Period of time: August 1998 – July 1999
Service: Claim processing & management
Project data: Combined cycle power plant development and test power plants
Complete pipeline construction BoP

SMART III R VO – Maintenance Contract

Client: ABB Turbinen Nürnberg GmbH, Nürnberg, Germany
Location: Abu Dhabi, U.A.E.
Value: n.s.
Period of time: October 1997 – May 1999
Service: Site management and Project Resident Engineer in Abu Dhabi, U.A.E.
Project data: Maintenance of turbines and overhaul / renewal of instrumentation and system control for:
2 gas turbines & 2 steam turbines
Instrumentation & control system

Cottam Development Centre

Client: Lentjes mce Anlagen- und Rohrleitungsbau GmbH, Ratingen, Germany
Location: Cottam, Nottinghamshire, UK
Value: ca. DM 9 M
Period of time: 08 April 1998 – 31 July 1998
Service: local site management, risk management, information & document management
Project data: Combined cycle power plant development and test power plant
Complete pipeline construction

Caprolactam Leuna

Client: RAYTHEON Engineers & Constructors Litwin s.a., Puteaux, France
Location: Leuna, Germany
Value: ca. DM 90 M
Period of time: 01 March 1997 – 09 October 1998
Service: Coordination and supervision of the electrical installations for the cumene and phenol synthesis plants
Project data: Plant to produce caprolactam

LEUNA 2000

Client: VOEST-EBG Anlagentechnik GmbH, Leuna, Germany
Location: Leuna, Spergau, Germany
Value: ca. DM 3.5 M
Period of time: September 1997 – December 1997
Service: Support and assistance with the commissioning of the cracking plant
Project data: Oil refinery & cracking plant, turnkey including complete infrastructural facilities

Organisationsberatung Kesting

Construction company for turnkey construction with specialisation of prefabricated construction

Client: Lorenz Kesting GmbH & Co KG, Lünen, Germany
Location: Berlin, Lünen, Germany
Value: n.s.
Period of time: 01 November 1996 – 31 May 1997
Service: Development, introduction of organisation concepts and implementation across the enterprise
Reorganisation of the technical and commercial tender & order processing of KESTING Fertigbau GmbH & Co KG
Technical supervision and support of project management
Development of cooperation and contract concepts together with foreign partner companies and/or subcontractors as well as establishing of essential organisational and personnel structures
Project data:

Caprolactam Leuna

Client: RAYTHEON Engineers & Constructors Litwin s.a., Puteaux Cedex, France
Location: Leuna, Germany
Value: ca. DM 90 M
Period of time: 01 December 1996 – 31 January 1997
Service: Inventory of electrical installations of the phenol sysnthesis plant to be rehabilitated
Project data: Plant for the production of caprolactam

Train station canopy Spandau

Client: MERO Raumstruktur GmbH & Co, Würzburg, Germany
Location: Berlin-Spandau, Germany
Value: ca. DM 22 M
Period of time: 05 March1997 – 23 April 1997
Service: Local site management
Project data: Cantilever steel-glass construction, cable supported
First phase of the reconstruction of the train station

Power plant Plomin 2

Client: Klöckner Industrie-Anlagen GmbH, Duisburg, Germany
Location: Plomin, Croatia
Value: ca. DM 250 M
Period of time: 05 July 1996 – 07 September 1996
Service: Coordination of the tender preparation for the civil part including interface management for the package units
Project data: 210 MW coal power plant including coal handling system, 1.500 to/h
Jetty for big vessels up to 60.000 tons including unloading facilites / flue gas desulfurization plant
Completing works at the boiler house and the turbine building
Completing works of the site infrastructure

Oxy synthesis Leuna

Client: RAYTHEON Engineers & Constructors Litwin s.a., Puteaux Cedex, France
Location: Leuna, Germany
Value: ca. DM 50 M
Period of time: 01 May 1996 – 30 November 1996
Service: Coordination and supervision of measurement and control technology as well as automation on the construction site
Project data: Plant for production of hydrogen peroxyde

Fatty acid plant Mianyang

Client: Feld & Hahn GmbH, Bendorf, Germany
Location: Mianyang, Sichuan, China
Value: ca. DM 40 M
Period of time: 01 June 1995 – 31 October 1995
Service: Local site management during plant assembly
Project data: Plant for production of fatty acids

Fact finding, South-East Asia

Client: WALTER BAU AG, Augsburg, Germany
Location: Malaysia, Philippines
Value: ca. DM 600 M
Period of time: 10 April 1995 – 01 July 1995
Service: Local data collection and negotiations management on behalf of the client
Project data: Telecom Tower Manila, Philippines / ca. DM 200 M
Shah Alam Exibition Centre, Malaysia / ca. DM 400 M

Cement plant Hoffuf

Client: INDUMONT Industrie-Montage GmbH, Cologne, Germany
Location: Hoffuf, K.S.A.
Value: ca. DM 250 M
Period of time: 28 February 1995 – 31 July 1995
Service: Commercial construction management of the plant assembly
Project data: Cement plant, 1 M tpa, turnkey

Residential construction Andreapol

Client: STRABAG INTERNATIONAL GMBH, Cologne, Germany
Location: Andreapol, Russia
Value: n.s.
Period of time: 01 September 1994 – 31 December 1994
Service: Section construction management for community and social housing
Project data: New construction of satellite city for the repatrisation of Russian soldiers

Personal references of Dipl. Ing. Helmut Hermanns

Housing construction combine Tschist

Location: Tschist, Belarus
Value: ca. DM 200 M, turnkey
Period of time: July 1993 – August 1995
Project data: Aerated concrete plant, 200.000 m3/a, dry mortar plant, 24.000 tpa
concrete roof tile plant, 20.000.000 roof tiles, accessory pieces and special roof tiles
Limestone plant, 50.000 bis 100.000 tpa
Supply and disposal facilities, etc.

WWT Pa-Li, Digesting Plant

Location: Pa-Li, Taiwan, ROC
Value: ca. DM 240 M, turnkey
Period of time: December 1990 – September 1994
Project data: Sludge digestion plant with gas power plant, 6 digestion tower (egg-shaped) at 9.000 m3 with operation buildings, sludge gas storage and power generation

Oxygen plant, CODELCO

Location: Chuquicamata, Chile
Value: ca. DM 35 M, turnkey
Period of time: July 1990 – November 1992
Project data: Air separation plant, 15.000 Nm3/h oxygen

BAUXIVEN Bauxite Handling

Location: Los Pijiguaios, Venezuela
Value: ca. DM 90 M, turnkey
Period of time: April 1989 – November 1993
Project data: Bauxite storage and transport facilities
Pie de Cerro:
600.000 t / 1.600 t/h
El Jobal:
350.000 t / 1.600 – 3.400 t/h

FGD-Plant Cayirhan

Location: Cayirhan, Turkey
Value: ca. DM 89 M, turnkey
Period of time: February 1988 – June 1992
Project data: Flue gas desulfurization plant for a lignite power plant with 2 blocks at 150 MW power

Nhava Sheva Port project / Lot II

Location: Bombay (Mumbai), India
Vaule: ca. US$ 110 M, turnkey
Period of time: February 1987 – March 1991
Project data: Transport and storage facilities for crop, sulphur & fertilizer including ship unloader, conveyor systems, store houses ( ca. 120.000 m2), bagging units as well as truck and waggon loading

Coral Gardens Hotel

Location: Hikkaduwa, Sri Lanka
Value: ca. DM 25 M, turnkey
Period of time: April 1984 – July 1986
Project data: 158 room tourist resort of local design including outside facilities and marina

Mar Moh lignite handling

Location: Mae Moh, Thailand
Valua: ca. US$ 50 M, turnkey
Period of time: February 1982 – November 1984
Project data: Crushing and transport plant for lignite, 2.200 t/h. including mobile crusher, conveyor systems, stacker and reclaimer

Sponge iron handling Khor al Zubair

Location: Khor al Zubair, Iraq
Value: ca. DM 130 M, turnkey
Period of time: February 1982 – June 1984
Project data: Transport and storage facilities for sponge iron / storage ( 40.000 t ) under inert gas conditioning / conveyor system 2.000 t/h

Central utilities Taji

Location: Taji, Iraq
Value: ca. DM 69 M, turnkey
Period of time: February 1981 – June 1983
Project data: Utilities for industrial park Taji, waste water purification, 1.200 m3/day, water treatment, 4.000 m3/day, E-station 80 MW air separation plant, fire fighting facilities, etc.

Semen Kupang cement factory

Location: Kupang, Timor Island, Indonesia
Value: ca. DM 60 M, turnkey
Period of time: April 1981 – February 1983
Project data: Cement factory, 120.000 tpa Portland cement (furnace system)

Sports facilities Saudi Arabia

Location: Dammam, Jeddah, Riyadh / K.S.A.
Value: ca. DM 740 M, turnkey
Period of time: April 1976 – February 1980
Project data: Sportshalls and indoor swimming pools of olympic size, identical in construction at the above mentioned locations